|
|
|
|
ROBBINSVILLE HIGH SCHOOL
|
|
Robbinsville
NJ
|
|
Complete construction of outdoor sports facilities, including running track, turf field, stadium and tennis facility. BSS-100 Track System
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
SOUTHERN REGIONAL HIGH SCHOOL
|
|
Manahawkin
NJ
|
|
Complete construction of outdoor tennis facility.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
VILLANOVA UNIVERSITY
|
|
Villanova
PA
|
|
Complete removal of outdoor running track surfacing along with sub-base and reconstruction including preparation and construction of new laser controlled asphalt pavement receiving surface.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
PAUL VI HIGH SCHOOL
|
|
Haddon Township
NJ
|
|
Complete construction of sub-base, drainage and curb for installation of synthtic turf field.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
HOLMDEL HIGH SCHOOL
|
|
Holmdel
NJ
|
|
Complete removal and reconstruction of outdoor stadium football field and outdoor running track. BSS-300 Track Systems/IC Improvements Synthetic Turf System
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
ROBBINSVILLE HIGH SCHOOL
|
|
Robbinsville
NJ
|
|
Complete construction of sub-base, drainage and curb for installation of synthetic turf field.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
MILFORD HIGH SCHOOL
|
|
Milford
DE
|
|
Complete reconstruction of outdoor football and track stadium. BSS-100 Track System/Fieldturf Synthetic Turf System
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
BISHOP EUSTACE PREPARATORY SCHOOL
|
|
Pennsauken
NJ
|
|
Complete construction of sub-base, drainage and curb for installation of synthetic turf field.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WOODBURY HIGH SCHOOL
|
|
Woodbury
NJ
|
|
Complete renovation of outdoor running track with a new BSS-300 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
EAST BRUNSWICK HIGH SCHOOL
|
|
East Brunswick
NJ
|
|
Complete construction of high school stadium including sub-base, drainage and curb for synthetic turf field.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
EAST BRUNSWICK HIGH SCHOOL STADIUM
|
|
East Brunswick
NJ
|
|
Complete construction of stadium, including sub-base, drainage, synthetic turf, running track surfacing, bleachers, sidewalks and fencing. Mondo Track System/Fieldturf Synthetic Turf
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
HOLMDEL HIGH SCHOOL
|
|
Holmdel
NJ
|
|
Complete construction of sub-base, drainage and curb for installation of synthetic turf field.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
|
|
FLORENCE HIGH SCHOOL
|
|
Florence
NJ
|
|
Complete construction of sub-base, asphalt and synthetic track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
|
|
PAUL VI HIGH SCHOOL
|
|
Haddon Township
NJ
|
|
Complete layout and construction of sub-base and laser controlled asphalt for synthetic track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
RAMAPO HIGH SCHOOL
|
|
Oakland
NJ
|
|
Complete renovation of outdoor running track with BSS-100 Track Respray System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
BISHOP EUSTACE PREPARATORY SCHOOL
|
|
Pennsauken
NJ
|
|
Complete layout and construction of sub-base and laser controlled asphalt receiving surface for synthetic track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
HOLLYWOOD WEST SPORTS PARK
|
|
Hollywood
FL
|
|
Complete preparation of drainage, subbase and installation of synthetic athletic turf. Astroturf Synthetic Turf System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
ROBBINSVILLE HIGH SCHOOL
|
|
Robbinsville
NJ
|
|
Complete layout and construction of sub-base and laser controlled asphalt for outdoor running track and tennis facilities.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
PAUL VI HIGH SCHOOL STADIUM
|
|
Haddon Twp.
NJ
|
|
Complete renovation including drainage, subbase, asphalt pavements, synthetic turf, running track, concrete sidewalks and fencing. BSS-300 Track System/Fieldturf Synthetic Turf.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WILBUR WATTS MIDDLE SCHOOL
|
|
Burlington City
NJ
|
|
Complete construction of laser controlled asphalt receiving surface for synthetic track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
SENECA HIGH SCHOOL
|
|
Tabernacle
NJ
|
|
Complete renovation of existing track system with BSS-100 Respray Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
EAST BRUNSWICK HIGH SCHOOL
|
|
East Brunswick
NJ
|
|
Complete layout and Installation of sub-base and laser controlled asphalt receivng surface for synthetic track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
TIMBERLANE MIDDLE SCHOOL
|
|
Pennington
NJ
|
|
Complete renovation of existing track with BSS-300 Track Resurfacing System
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WESTTOWN SCHOOL
|
|
Westtown
PA
|
|
Complete construction of outdoor running track facility including excavation, drainage, asphalt paving, concrete, bleachers and BSS-1000 embedded track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
BROWN BURTON PARK
|
|
Wilmington
DE
|
|
Complete construction of tennis and basketball courts including subbase preparation, asphalt paving and application of acrylic color coating with gamelines.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WOODSTOWN HIGH SCHOOL
|
|
Woodstown
NJ
|
|
Complete construction of track facility including excavation, asphalt milling, drainage, asphalt paving and BSS-300 embedded track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
GIANGIULIO PARK
|
|
Voorhees
NJ
|
|
Complete construction of outdoor synthetic turf field, including sub-base, drainage and synthetic turf surfacing.Fieldturf Synthetic Turf
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
JACKSON MEMORIAL HIGH SCHOOL
|
|
Jackson
NJ
|
|
Renovation of existing running track surface utilizing the BSS-100 Respray Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
HADDONFIELD MEMORIAL HIGH SCHOOL
|
|
Haddonfield
NJ
|
|
Complete reconstruction of track surface including demo, reconfiguration of layout, sub-base prep, asphalt pavement and track surfacing. BSS-1000 Embedded Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
ABSEGAMI HIGH SCHOOL
|
|
Galloway
NJ
|
|
Renovation of existing running track surface utilizing the BSS-100 Respray Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CHARLOTTE HIGH SCHOOL
|
|
Punta Gorda
FL
|
|
Construction of new outdoor running track including BSS-100 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
BERNARDS HIGH SCHOOL
|
|
Bernardsville
NJ
|
|
Complete renovation of outdoor track facility including removal of existing surface, milling of asphalt, installation of new laser controlled asphalt receiving surface and a new BSS-1000 embedded track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CLEARVIEW REGIONAL HIGH SCHOOL
|
|
Mullica Hill
NJ
|
|
Complete construction of outdoor running track with a BSS-300 Embedded Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
BERNARDS HIGH SCHOOL
|
|
Bernardsville
NJ
|
|
Complete renovation of existing outdoor running track facility including removal of existing track surfacing, milling of existing asphalt and installation of new laser controlled asphalt receiving surface for installation of new BSS-1000 track system
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
DEPTFORD HIGH SCHOOL
|
|
Deptford
NJ
|
|
Complete construction of tennis court facility.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CARLISLE HIGH SCHOOL
|
|
Carlisle
PA
|
|
Complete renovation of existing outdoor running track facility including removal of existing track surface, partial milling of asphalt, installation of new laser controlled asphalt receiving surface for a new BSS track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
VETERANS PARK
|
|
Berkley
NJ
|
|
Complete construction of tennis facility and practice wall.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CHEROKEE HIGH SCHOOL
|
|
Marlton
NJ
|
|
Complete construction of new turf field including excavation, drainage, sub-base prep and final grading for installation of synthetic turf system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
GESSINGER FIELD
|
|
Tenafly
NJ
|
|
Complete construction of outdoor running track with BSS-2000 Encapsulated Track Surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CONCORD HIGH SCHOOL
|
|
Wilmington
DE
|
|
Complete construction of competition tennis facility.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WILBUR WATTS MIDDLE SCHOOL
|
|
Burlington City
NJ
|
|
Complete construction of outdoor running track including BSS-200 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
GLOUCESTER CITY HIGH SCHOOL
|
|
Gloucester City
NJ
|
|
Complete renovation of existing running track facility including removal of existing track surface, partial milling of asphalt, installation of new laser controlled asphalt receiving surface for new BSS-300 embedded track.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WESLEY BISHOP PARK
|
|
Moorestown
NJ
|
|
Complete construction of synthetic turf football field, including excavation, drainage, subbase preparation and synthetic turf surface.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
HADDON HEIGHTS HIGH SCHOOL
|
|
Haddon Heights
NJ
|
|
Complete installation of new BSS-100 track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
SOUTHERN REGIONAL HIGH SCHOOL
|
|
Manahawkin
NJ
|
|
Complete reconstruction of tennis courts and outdoor running track with BSS-300 Resurfacing Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
HUB STINE FIELD
|
|
North Plainfield
NJ
|
|
Complete installation of new BSS-300 embedded track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
FLORENCE HIGH SCHOOL
|
|
Florence
NJ
|
|
Complete construction of new tennis and track facilities including sub-base, asphalt paving and sports surfacing. BSS-100 Track System
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
HURRELL FIELD
|
|
Glen Ridge
NJ
|
|
Complete construction of a new BSS-300 embedded track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WEST CHESTER UNIVERSITY
|
|
West Chester
PA
|
|
Complete preparation of sub-base and installation of laser controlled asphalt pavement receiving surface. Mondo Track System
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
GLOUCESTER CITY HIGH SCHOOL
|
|
Gloucester City
NJ
|
|
Complete renovation of existing track facility including new drainage system, removal of track surface, partial milling of asphalt and installation new laser controlled asphalt receiving surface.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CARAVEL ACADEMY
|
|
Bear
DE
|
|
Complete construction of turf field subbase receiving surface including drainage and final grading. Renovation of existing running track with BSS-100 Respray Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
LINDENWOLD HIGH SCHOOL
|
|
Lindenwold
NJ
|
|
Complete renovation of track facility including removal of surface, partial milling of asphalt and installation of new laser controlled asphalt receiving surface for a new BSS-200 track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
TEMPLE UNIVERSITY
|
|
Philadelphia
PA
|
|
Complete renovation of existing running track including removal of surface, partial milling of asphalt and new laser controlled asphalt receiving surface for new BSS-100 track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
LINDENWOLD HIGH SCHOOL
|
|
Lindenwold
NJ
|
|
Complete renovation of track facility including removal of track surface, partial milling of asphalt and installation of new laser controlled asphalt receiving surface.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CHERRY HILL EAST HIGH SCHOOL
|
|
Cherry HIll
NJ
|
|
Complete construction of outdoor running track utilizing BSS-300 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
LOWER CAPE MAY REGIONAL HIGH SCHOOL
|
|
Erma
NJ
|
|
Complete construction of new track facility and parking lot including excavation, sub-base construction, final grading, laser controlled asphalt pavements and installation of new BSS-100 track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CHERRY HILL WEST HIGH SCHOOL
|
|
Cherry Hill
NJ
|
|
Complete construction of outdoor running track utilzing BSS-300 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
LOWER CAPE MAY REGIONAL HIGH SCHOOL
|
|
Erma
NJ
|
|
Complete construction of new track facility and parking lots.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CAMDEN HIGH SCHOOL
|
|
Camden
NJ
|
|
Complete construction of outdoor running track utilizing BSS-100 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
NOTRE DAME HIGH SCHOOL
|
|
Lawrenceville
NJ
|
|
Complete renovation of existing track surface with BSS-100 Respray Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WOODROW WILSON HIGH SCHOOL
|
|
Camden
NJ
|
|
Complete construction of outdoor running track utilizing BSS-100 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
OAKCREST HIGH SCHOOL
|
|
Mays Landing
NJ
|
|
Complete renovation of existing running track system with BSS-100 Respray Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
DELRAN HIGH SCHOOL
|
|
Delran
NJ
|
|
Complete construction of outdoor running track including removal of existing surface, sub-base preparation, new asphalt receiving surface and new BSS-100 Track Surfacing System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
TEANECK HIGH SCHOOL
|
|
Teaneck
NJ
|
|
Complete renovation of existing track surfacing with BSS-100 Track Respray System
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CARL LEWIS STADIUM
|
|
Willingboro
NJ
|
|
Complete renovation of track facility including demo of existing surface and asphalt, prep sub-base, new laser controlled asphalt receiving surface and install new track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
UNIVERSITY OF VIRGINIA
|
|
Charlotsville
VA
|
|
Complete preparation of sub-base and construction of laser controlled asphalt pavement receiving surface for new synthetic track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
WEST DEPTFORD HIGH SCHOOL
|
|
West Deptford
NJ
|
|
Complete renovation of outdoor running track including removal of existing surface, new laser controlled asphalt receiving surface and new BSS-100 Track System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
SAINT AUGUSTINE'S COLLEGE
|
|
Raleigh
NC
|
|
Complete preparation of sub-base and construction of laser controlled asphalt pavement receiving surface for new sythetic track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
BISHOP EUSTACE PREPARATORY SCHOOL
|
|
Pennsauken
NJ
|
|
Complete construction of new football and track facility including sub-base preparation, drainage, laser controlled asphalt receiving surface and installation of BSS-100 Track Surfacing System.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
JOHNS HOPKINS UNIVERSITY
|
|
Baltimore
MD
|
|
Complete installation of a new BSS-100 synthetic water based track system.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
FLORENCE HIGH SCHOOL
|
|
Florence
NJ
|
|
Complete construction of tennis facility including a practice wall.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CALVARY BAPTIST HIGH SCHOOL
|
|
Clearwater
FL
|
|
Complete construction of stadium including all sub-base, drainage, asphalt pavements, curb and sidewalks for installation of synthetic turf and polyurethane outdoor track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
GATEWAY HIGH SCHOOL
|
|
Woodbury Heights
NJ
|
|
Complete construction of competition tennis facility.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CALVARY BAPTIS HS
|
|
Clearwater
FL
|
|
Complete construction of stadium including all sub-base, drainage, asphalt pavements, curb and sidewalks for installation of synthetic turf and polyurethane track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
ROBBINSVILLE HIGH SCHOOL
|
|
Robbinsville
NJ
|
|
Complete construction of competition tennis facility.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|
|
|
CALVARY BAPTIST HIGH SCHOOL
|
|
Clearwater
FL
|
|
Complete construction of stadium includingall sub-base, drainage, asphalt pavements, curb and sidewalks for installation of synthetic turf and polyurethane outdoor track surfacing.
|
|
SHOW PROJECT DETAILS
|
|
|
|
|